Vote to Create More Storage

From Pumping Station One
Revision as of 05:15, 4 December 2024 by Anfroholic (talk | contribs)
sheet goods

Sponsors

  • Andrew Wingate
  • proposed floorplan
    Jennie Plasterer

History

  • Mailing List Announcement: 12-4-24
  • Language Locked:
  • To be Voted on:

Background

We are rapidly running out of member storage. This plan will correct this in addition to solving several current problems.

  • Lockers furniture
  • Space annexing
  • New pallet racks (2) in never neverland
  • Sheet good storage
  • Paint Drying Facilities
Lockers render

Storage space will be expanded to roughly 100 spaces.

  • Roughly 120 lockers (currently there are 30 lockers capacity)
  • Owners will be able to make their lockers closed off if desired
  • All lockers will have drawer slides with 100lb capacity
  • Larger spaces than current lockers and larger than catwalk lockers

If filled this would bring in $3,600 per month ($43k/yr)

This would cost approximately $10,000 dollars.

Expected Expenditures
cost per drawer ext set
drawer slides 10 $1,000.00
drawer wood 20 $2,000.00
elctronics 15 $1,500.00
frame wood $1,200.00
frame metal $1,200.00
electronics $800.00
pallet racks $2300.00
$10,000

References

  • Currently there are 66 storage spaces on the catwalk
  • Currently there are 30 lockers in general
  • We have over 700 members; currently 90 people have claim to storage

Language

Authorize up to $10,000 dollars to be spent on additional storage solutions, to be spent before April 1, 2025.