Meeting Notes 2012-08-14: Difference between revisions
From Pumping Station One
No edit summary |
No edit summary |
||
| Line 6: | Line 6: | ||
}} | }} | ||
Meeting Begin: | Meeting Begin: 08:12 pm | ||
=== Agenda === | === Agenda === | ||
| Line 20: | Line 20: | ||
=== Minutes === | === Minutes === | ||
* Tim Introduced the board | |||
* Tim had the new people introduce themselves | |||
* Tim doesn't have any buildout expenses to report as no-one has handed in any reciepts yet. | |||
* The SawStop table saw has come in and needs to be put together | |||
* We just paid our first electric bill and it was a little higher than expected. Please don't leave lights or AC on. | |||
* There is a leak in the roof near the workshop AC. Tim will speak with the landlord about it. | |||
* Tonight is 300 seconds of fame. | |||
* Wed. 7pm, Knit Lab with Shelly Lewis | |||
* Thurs. 7pm, Python Office Hours with Tim Saylor | |||
* We now need a new area host for graphic arts and textiles. Nominate yourself if you are interested and feel you have skills in those areas. | |||
* There is now a giant chalk board up the side of the main stairs (thanks to Mallory) and there is a large mural in the back stairwell (thanks to Shellie) | |||
* New member Jeff has now brought in a large amount of new machine equipment | |||
* Power Wheels is going to the New York Maker Faire | |||
* TOOOL will be holding a "Locktoberfest" either the second or third Saturday of October involving beer, food, and lockpicking | |||
* Beer Church is going to start brewing at the space. | |||
* Anthony has researched building a small clean-room in the space for Open Science and is looking to plan the location for the walls. | |||
Meeting End: | |||
Meeting End: 08:45 pm | |||