2011 New Space Search: Difference between revisions

From Pumping Station One
Line 12: Line 12:
* adequate plumbing--we need a bathroom that doesn't smell
* adequate plumbing--we need a bathroom that doesn't smell
* Decent heating/control of our own heating
* Decent heating/control of our own heating
* Good power - we only have 110V/15Amp and 220V/15 Amp breakers we need, at least, access to 220V/30Amp and, ideally, access to 3-phase
* Good power - we only have 110V/15A and 220V/15A breakers we need, at least, access to 220V/30A and, ideally, access to 3-phase
* access to water in the space
* access to water in the space