Vote to Update Tidy Space Policy (2024): Difference between revisions

From Pumping Station One
Hawleynr (talk | contribs)
Hawleynr (talk | contribs)
Line 60: Line 60:
*'No-Go Zones' clarify existing rules around worktables, walkways, etc.
*'No-Go Zones' clarify existing rules around worktables, walkways, etc.


*For items stored improperly in No-Go Zones, the time between red ticketing and moving to salvage decreased to 24 hours (from 72 hours)
*For items stored improperly in No-Go Zones, the time between red ticketing and moving to salvage decreased to from 72 hours to 24 hours. When temporary storage is difficult or impossible, 2 Deputies can skip the 24 hour period at their discretion.


*For Standing Projects left on worktables (glue/paint/finish drying, etc) time limit increased to 3 hours (from 1 hour)
*For Standing Projects left on worktables (glue/paint/finish drying, etc) time limit increased from 1 hour to 3 hours.


*Removed obsolete areas/language
*Removed obsolete areas/language