Java Master 2002 Coffee Roaster: Difference between revisions
From Pumping Station One
| Line 58: | Line 58: | ||
* Get stuff ready: | * Get stuff ready: | ||
** Get hopper, funnel, bags from Kitchen | ** Get hopper, funnel, bags from Kitchen | ||
** Weigh beans ( | ** Weigh beans (Kitchen has a scale) | ||
* Turn Power on | * Turn Power on | ||
* Turn Heat on | * Turn Heat on | ||
* Check (and, if necessary, empty) chaff collector | * Check (and, if necessary, empty) chaff collector | ||
* | * Turn on exhaust fan (switch on wall to the right of the machine) | ||
* Set air and bean temperatures | * Set air and bean temperatures | ||
* Put hopper in place over the blower vents | * Put hopper in place over the blower vents | ||
| Line 79: | Line 77: | ||
* Bag the beans | * Bag the beans | ||
* Turn off Heat and Power switches | * Turn off Heat and Power switches | ||
* Turn off exhaust fan | |||
* Turn off | * Return hopper, funnel, and supplies | ||
* Return hopper, funnel, and supplies | |||
== Safety == | == Safety == | ||