Java Master 2002 Coffee Roaster: Difference between revisions
From Pumping Station One
| Line 167: | Line 167: | ||
== Operation Checklist == | == Operation Checklist == | ||
* Get stuff ready: | * Get stuff ready: | ||
* Hook | ** Get hopper, funnel, bags from Kitchen | ||
** Weigh beans (Small Metals has a scale.) | |||
* Hook | |||
* Plug in | * Plug in | ||
* Turn Power on | * Turn Power on | ||
* | * Turn Heat on | ||
* Check (and, if necessary, empty) chaff collector | |||
* | * Set air and bean temperatures | ||
* hopper in place over the blower vents | * Put hopper in place over the blower vents | ||
* | * Pour in beans | ||
* cap | * Make certain the top cap is in place | ||
* Hit Run | * Hit Run | ||
* | * Hot air heats up beans, eventually beans reach set Bean temperature | ||
* | * Machine turns off heat, cooling water starts, machine continues to blow air to cool down beans. | ||
* Wait for bean temp to drop below 370. | * Wait for bean temp to drop below 370 F, at which point yellow Reset lamp lights. | ||
* | * The operator can dump the beans now, or continue to cool the beans in the chamber. To dump: | ||
* Pull handle to dispense beans into hopper | ** Hit the Stop button. | ||
* | ** Pull thr handle to dispense beans into hopper. | ||
* | ** Let the air vents under the hopper cool the beans. | ||
* Bag the beans. | |||
* | * Turn off Heat and Power switches. | ||
* | * Disconnect power | ||
* | * Turn off water | ||
* | * Disconnect water | ||
* | * Put hose back nearly | ||
* Put machine back | |||
* Return hopper, funnel, and supplies to Kitchen | |||