General Operations Team: Difference between revisions

From Pumping Station One
Garynhouse (talk | contribs)
Garynhouse (talk | contribs)
Line 102: Line 102:
5. Relocated booth air drop to left side of booth.   
5. Relocated booth air drop to left side of booth.   


6. Document electrical. Document panel door legends to wiki(DONE GN). Update CAD with current wiring (mostly done AM). Plot locations of projected wiring for HM/CC/General move (needs mostly done SB and Hosts, CAD in process AM, bid spec AM & BD tbd).
6. Document electrical. Document panel door legends to wiki(DONE GN). Update CAD with current wiring (mostly done AM). Plot locations of projected wiring for HM/CM/General move (needs mostly done SB and Hosts, CAD in process AM, bid spec GN, AM & BD tbd).


7. Transition member paid storage to share with MMT (done GN & Scott Yoder )
7. Transition member paid storage to share with MMT (done GN & Scott Yoder )