AreaManagerVote: Difference between revisions

From Pumping Station One
No edit summary
No edit summary
Line 28: Line 28:
In the event that the Area Manager does not perform the duties to the satisfaction of the membership and/or the BoD, the BoD reserves the right to remove the person from their position as Area Manager. At that time, the BoD may vote in a new volunteer for the role.
In the event that the Area Manager does not perform the duties to the satisfaction of the membership and/or the BoD, the BoD reserves the right to remove the person from their position as Area Manager. At that time, the BoD may vote in a new volunteer for the role.


In the event that a new area and Area Manager role is deemed necessary, the area and role can be defined and voted in by the membership as an amendment to this proposal.


At this time, some suggested areas within Pumping Station: One that would be eligible for Area Managers are the:


At this time, the areas within Pumping Station: One that are eligible for Area Managers are the:
*Electronics shop (under the loft)
 
*Wood/Metal shop (in the back garage)
*Electronics shop
*Craft area (outside wall of the loft)
**This includes all tools and materials within the area beneath the loft.
*General area (shared spaces, classroom, loft, and main room)
 
*Wood/Metal shop
**This includes all tools and materials within the room beside the rear garage.
 
*Craft area
**This involves all tools and materials within the (new) craft area along the outer loft wall.


*General area
**This involves the general use areas within the Main Room, as well as the shared front area, the loft, and the classroom.
In the event that a new area and Area Manager role is deemed necessary, the area and role can be defined and voted in by the membership as an amendment to this proposal.


===Vote===
===Vote===


===Passed===
===Passed===