AIM Kiln 1413: Difference between revisions

From Pumping Station One
Drreyno (talk | contribs)
No edit summary
Drreyno (talk | contribs)
No edit summary
Line 2: Line 2:
|owner = PS1
|owner = PS1
|hostarea = Small Metals
|hostarea = Small Metals
|certification = yes (pending)
|certification = yes  
|hackable = no
|hackable = no
|model = 1413/2TF
|model = 1413/2TF
Line 16: Line 16:


==Status==
==Status==
Kiln should be in working order, but will not be ready for use until ventilation is installed. (Check back in a few weeks.)
Kiln works


==Authorization==
==Authorization==
Authorization is still pending. May not be required.
Authorization is required


==Manuals==
==Manuals==
https://www.aimkiln.com/manuals
https://www.aimkiln.com/manuals