AIM Kiln 1413: Difference between revisions
From Pumping Station One
No edit summary |
No edit summary |
||
| Line 2: | Line 2: | ||
|owner = PS1 | |owner = PS1 | ||
|hostarea = Small Metals | |hostarea = Small Metals | ||
|certification = | |certification = yes (pending) | ||
|hackable = no | |hackable = no | ||
|model = 1413/2TF | |model = 1413/2TF | ||
Revision as of 13:25, 15 September 2020
Status
Kiln should be in working order, but will not be ready for use until ventilation is installed. (Check back in a few weeks.)
Authorization
Authorization is still pending. May not be required.