AIM Kiln 1413: Difference between revisions
From Pumping Station One
No edit summary |
|||
| Line 20: | Line 20: | ||
==Authorization== | ==Authorization== | ||
Authorization is still pending. May not be required. | Authorization is still pending. May not be required. | ||
==Manuals== | |||
https://www.aimkiln.com/manuals | |||
Revision as of 20:04, 5 April 2019
Status
Kiln should be in working order, but will not be ready for use until ventilation is installed. (Check back in a few weeks.)
Authorization
Authorization is still pending. May not be required.