AIM Kiln 1413: Difference between revisions
From Pumping Station One
Created page with "{{Template:EquipmentPage |owner = PS1 |hostarea = Small Metals |certification = yes (pending) |hackable = no |model = 1413/2TF |serial = ACO7055 |arrived = 10/2018 |where = Sm..." |
|||
| Line 16: | Line 16: | ||
==Status== | ==Status== | ||
Kiln should be in working order, but will not be ready for use until ventilation is installed. (Check back in a few weeks.) | |||
==Authorization== | ==Authorization== | ||
Authorization is still pending. May not be required. | Authorization is still pending. May not be required. | ||