Belovac Vacuum Forming Machine: Difference between revisions

From Pumping Station One
Mariano (talk | contribs)
No edit summary
Mariano (talk | contribs)
No edit summary
Line 92: Line 92:
|
|
# Move material frame into heater
# Move material frame into heater
|[[File:Bvf_vacuum_valve.jpg|300px]]
|[[File:Bvf_heat_1.jpg|300px]]
|-
|-
|
|
Line 111: Line 111:
# Pull Material frame forward (towards front/away from heaters)
# Pull Material frame forward (towards front/away from heaters)
# Inspect Plastic is ready (sufficiently heated/soft)
# Inspect Plastic is ready (sufficiently heated/soft)
|[[File:Bvf_frame_forward.jpg|300px]]
|-
|-
|
|
# Make certain area is clear before raising bed/platen/platform
# push lever down to raise vacuum bed/platen/platform
# push lever down to raise vacuum bed/platen/platform
|
|
[[File:Bvf_platform.jpg|300px]]
[[File:Bvf_platform_lever.jpg|300px]]
[[File:Bvf_platform_lever.jpg|300px]]
|-
|-