Vote to buy a powdercoating system 2.0: Difference between revisions
From Pumping Station One
Tachoknight (talk | contribs) |
Tachoknight (talk | contribs) |
||
| Line 24: | Line 24: | ||
== Language == | == Language == | ||
We authorize the Board of Directors to spend up to $2500 on a powder coating oven and its installation. <s>We further authorize the board to permit the disassembly and disposal of the current, unfinished oven.</s> | We authorize the Board of Directors to spend up to $2500 on a powder coating oven and its installation. <s>We further authorize the board to permit the disassembly and disposal of the current, unfinished oven.</s>''Unnecessary given the existing booth has been removed.'' | ||