CNC Plasma Cutter maintenance: Difference between revisions
From Pumping Station One
No edit summary |
|||
| Line 13: | Line 13: | ||
! | ! | ||
! | ! | ||
|- | |||
|x | |||
| | |||
|Feb 8 2018 | |||
|Tucker Tomlinson | |||
|- | |- | ||
| | | | ||
Revision as of 19:34, 8 February 2018
The cnc plasma cutter has fairly straightforward maintenance requirements. It should periodically be cleaned of grit so that ht ecarriage travel is smooth and the bearings are free of contaminates. The torch head should also be inspected and the consumibles replaced if necessary. While users should perform basic cleanup and inspection, PS1 should perform these operations at least monthly:
Example maintenance log table
| clean | inspect/replace consumables | date completed | person completing |
|---|---|---|---|
| monthly | monthly | ||
| x | Feb 8 2018 | Tucker Tomlinson | |