Vote to change the Kitchen Zone: Difference between revisions
From Pumping Station One
Rtystgeeke (talk | contribs) |
Rtystgeeke (talk | contribs) No edit summary |
||
| Line 1: | Line 1: | ||
=Background= | =Background= | ||
The main purpose of this vote is twofold: take advantage of space that became available during the space expansion and reinstate the expired kitchen renovation budget with some modifications. One space issue that has become evident is the disconnect between the kitchen and the lounge, so this vote seeks to provide options for the membership to decide if the Kitchen Area should move over to occupy what was once slotted to be the small metals area. This area is now officially general area space, and is now being occupied by cold metals, and both areas are in agreement with the possible move. | |||
Plans are provided showing the two different floor layouts that may occur should one of the proposed plans in this vote pass. This vote is to decide if we should pursue a new plan A over the old plan B when the renovation takes place. This vote also includes a budget valid for either of the proposed plans. | |||
[[File:Kitchen-plan-A-2017.jpg]] | [[File:Kitchen-plan-A-2017.jpg]] | ||
| Line 75: | Line 61: | ||
===Language=== | ===Language=== | ||
We authorize the board to shift the kitchen area | We authorize the board to shift the kitchen area as per the recommendation of the membership based on the 2 proposed plans. We authorize the board to spend up to $4200.00 for equipment, materials, and supplies to renovate the kitchen. The budgeted funds are valid for 6 months after the passing of this vote. | ||
====Vote Options:==== | |||
Yes to Plan A with Budget | |||
Yes to Plan B with Budget | |||
No | |||