Electrical: Difference between revisions

From Pumping Station One
Tucker (talk | contribs)
Tucker (talk | contribs)
Line 155: Line 155:
====PP1-4====
====PP1-4====


In the tool cage.
On east wall of shop close to the rear sliding door to the dock


{|Class="wikitable sortable" border="1" style="td { border: 1px solid #000000}"
{|Class="wikitable sortable" border="1" style="td { border: 1px solid #000000}"
Line 174: Line 174:
|-
|-
|37 || yes, works ||20 amp, 120v, hot metal at welding area.
|37 || yes, works ||20 amp, 120v, hot metal at welding area.
|}
The following is the result of wire tracing done 04/25/2017. Tucker
Conduits from this panel were sharpie labeled with letters for this mapping.
{|Class="wikitable sortable" border="1" style="td { border: 1px solid #000000}"
|-
! conduit label !! routing !! What It feeds
|-
| A || up to shop ceiling || 3phase drop to DoAll band-saw
|-
| B || Up to ceiling and a junction, One leg out of the Junction feeds a 220V 50A drop in small metals (used to feed welder when hot metals lived there), second run from junction feeds unused junction box on S wall of boiler room || 50A 220V drop in small metals
|}
|}