Electrical: Difference between revisions
From Pumping Station One
| Line 155: | Line 155: | ||
====PP1-4==== | ====PP1-4==== | ||
On east wall of shop close to the rear sliding door to the dock | |||
{|Class="wikitable sortable" border="1" style="td { border: 1px solid #000000}" | {|Class="wikitable sortable" border="1" style="td { border: 1px solid #000000}" | ||
| Line 174: | Line 174: | ||
|- | |- | ||
|37 || yes, works ||20 amp, 120v, hot metal at welding area. | |37 || yes, works ||20 amp, 120v, hot metal at welding area. | ||
|} | |||
The following is the result of wire tracing done 04/25/2017. Tucker | |||
Conduits from this panel were sharpie labeled with letters for this mapping. | |||
{|Class="wikitable sortable" border="1" style="td { border: 1px solid #000000}" | |||
|- | |||
! conduit label !! routing !! What It feeds | |||
|- | |||
| A || up to shop ceiling || 3phase drop to DoAll band-saw | |||
|- | |||
| B || Up to ceiling and a junction, One leg out of the Junction feeds a 220V 50A drop in small metals (used to feed welder when hot metals lived there), second run from junction feeds unused junction box on S wall of boiler room || 50A 220V drop in small metals | |||
|} | |} | ||