Electrical: Difference between revisions
From Pumping Station One
| Line 26: | Line 26: | ||
|- | |- | ||
| 22 || unused || this is a stray 208v single red wire on a 3 phase breaker that runs to wiring troughin the boiler room. Should be disconnected and abandoned.(used to be paired with wires pp1-2 # 35&37) | | 22 || unused || this is a stray 208v single red wire on a 3 phase breaker that runs to wiring troughin the boiler room. Should be disconnected and abandoned.(used to be paired with wires pp1-2 # 35&37) | ||
|- | |||
|} | |||
<br /> | |||
The following is the result of wire tracing done 04/25/2017. Tucker | |||
<br /> | |||
Conduits from this panel were sharpie labeled with letters for this mapping. | |||
{|Class="wikitable sortable" border="1" style="td { border: 1px solid #000000}" | |||
|- | |||
! Conduit Label !! feed path !! What It Feeds | |||
|- | |||
| A || direct run across ceiling to junction in catwalk, from junction along catwalk and down to PP1-5 || PP1-5 | |||
|- | |||
| B || Via PB1-2 to roof || AC | |||
|- | |||
| C || To junction above SE corner of boiler room, then to socket on boiler room wall || Socket PP1-1:10 on small metals wall near S end of wall | |||
|- | |||
| D || direct run to boiler room || main boiler room feed | |||
|- | |||
| E || across shop celing to catwalk || Feeds through wall to upstairs rooms | |||
|- | |||
| F || across shop roof to junction ~7ft from old laser exhaust, leg towards east wall dead ends, leg S drops to kitchen wall, runs into new lounge, takes 90deg through lounge wall and into safe||PP6 | |||
|- | |||
| G || Direct to boiler room || compressor | |||
|- | |- | ||
|} | |} | ||