Vote to Renovate the Kitchen: Difference between revisions

From Pumping Station One
Mskilton (talk | contribs)
m Reverted edits by Leo (talk) to last revision by Adriana
Adriana (talk | contribs)
No edit summary
Line 16: Line 16:


<ol>
<ol>
<li>Donated Commercial Stove - Free, will install in-house.</li>
<li>Donated Commercial Range - Free, will install in-house.</li>
* Commercial Stove Vent Hood $1000.00 - Shelly and Gerald located a commercial stove vent hood in great condition at Evanston Rebuilders Warehouse.  It is being held without deposit for up to two weeks.  If funding for deposit, and/or purchase does not become available in time, another vote may need to be drafted for up to the retail cost of a new commercial stove vent hood (4000.00).
* Commercial Range Vent Hood $1500.00 - New Commercial Range Hood
* Install a 10" ventilation duct for the commercial stove in the kitchen - $300.00.
Used may be missing insert - Shelly and Gerald located a residential stove vent hood in great condition at Evanston Rebuilders Warehouse.  It is being held without deposit for up to two weeks.  If funding for deposit, and/or purchase does not become available in time, another vote may need to be drafted for up to the retail cost of a new commercial range vent hood.
* Cubby/Electrical Build-out $100.00 - A cubby hole extending into the general area needs to be built to make room for the commercial stove.
* Install a 10" ventilation duct for the commercial range in the kitchen - $300.00.
* Cubby/Electrical Build-out $100.00 - A cubby hole extending into the general area needs to be built to make room for the commercial range.
<li>Cabinetry and wall re-framing/re-enforcing $1000.00- The kitchen will be expanding with the relocation of beer church.  Upper and lower cabinets will be installed in this new dining area.</li>
<li>Cabinetry and wall re-framing/re-enforcing $1000.00- The kitchen will be expanding with the relocation of beer church.  Upper and lower cabinets will be installed in this new dining area.</li>
<li>Flooring Resurfacing - Leftover supplies from Lounge 2.0 and CNC areas will be used to resurface the kitchen floor.</li>
<li>Flooring Resurfacing - Leftover supplies from Lounge 2.0 and CNC areas will be used to resurface the kitchen floor.</li>
Line 40: Line 41:
</ol>
</ol>
   
   
Sub total: $3000
Sub total: $3500
         plus 20% contingency funds         
         plus 20% contingency funds         
Total      $3600.00
Total      $4200.00


== Language ==
== Language ==


We authorize the board to spend up to $3600.00 for equipment, materials and supplies to renovate the kitchen.  
We authorize the board to spend up to $4200.00 for equipment, materials and supplies to renovate the kitchen.  


The funding for this vote will expire 6 months from the date of approval.
The funding for this vote will expire 6 months from the date of approval.