Vote to Fund Space Expansion Buildout: Difference between revisions

From Pumping Station One
Dba (talk | contribs)
Dba (talk | contribs)
Line 10: Line 10:


== Background ==
== Background ==
We signed the lease for the 3515 Elston and will move in soon. The space planning committee created three floor plans for the combined space. Through a survey, the full members selected plan #1 (insert link).   
We signed the lease for the 3515 Elston and will move in soon. The space planning committee created three floor plans for the combined space. Through a survey, the full members selected plan #1:  https://drive.google.com/file/d/0B8OYIUv_jjoAdE1qd0RMUTFLUUk/view  


This vote describes the tasks required for the initial build-out of the combined space.   
This vote describes the tasks required for the initial build-out of the combined space.