** Compressed air for the laser and hot metals. $300
** Compressed air for the laser and hot metals. $300


*Obtain necessary permits if they are deemed appropriate.
*Demolition
*Remove temporary partition in new lounge. Paint and repair drywall if necessary.  Materials: paint.
** Remove temporary partition in new lounge. Paint and repair drywall if necessary.  Materials: paint.
*Move equipment to new locations.
** Remove tool cage walls.
 
* Obtain necessary permits if they are deemed appropriate.
* Move equipment to new locations.
* Vacuum dust from trusses, walls, etc. in 3519 shop.  
* Vacuum dust from trusses, walls, etc. in 3519 shop.  
*Remove tool cage walls.
* Purchase and install shelving for member storage. $500
*Purchase and install shelving for member storage. $500
* Benches for general work area.
*Benches for general work area.
* Rent or purchase a section of rolling scaffolding.  This will be used in the shop to help with the work near the roof such as electrical, ducting & cleaning. $300
* Rent or purchase a section of rolling scaffolding.  This will be used in the shop to help with the work near the roof such as electrical, ducting & cleaning. $300