Vote to Fund Space Expansion Buildout: Difference between revisions
From Pumping Station One
| Line 10: | Line 10: | ||
== Background == | == Background == | ||
We signed the lease for the 3515 Elston and move in soon. The space planning committee created three floor plans for the combined space. Through a survey, the full members selected plan #1 (insert link). This vote will allocate the money to build-out the 3515 and modify the existing space as indicated below. | |||
* HVAC | * HVAC | ||
| Line 17: | Line 17: | ||
** Install ventilation duct and fan for the kitchen. Use the duct currently used by the laser. | ** Install ventilation duct and fan for the kitchen. Use the duct currently used by the laser. | ||
** Install ventilation duct and fan for small metals (jewelry). | ** Install ventilation duct and fan for small metals (jewelry). | ||
** | ** Move dust collection system for woodworking. Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. | ||
** Extend ventilation duct and add hood for hot metals. | ** Extend ventilation duct and add hood for hot metals. | ||
* Electrical | * Electrical | ||
** | ** Install new power outlets for cold metals and hot metals. Materials: conduit, wire, outlets. | ||
** | ** Install 2 240v power outlets for woodworking. | ||
* Plumbing | * Plumbing | ||
| Line 37: | Line 37: | ||
*Move equipment to new locations. | *Move equipment to new locations. | ||
* | * Clean dust from trusses, walls, etc. in old shop. {we may want to hire this out} | ||
*Remove tool cage walls. | *Remove tool cage walls. | ||