Vote to Fund Space Expansion Buildout: Difference between revisions
From Pumping Station One
| Line 12: | Line 12: | ||
* HVAC | * HVAC | ||
** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser. The roof perforation will be done by a professional roofer. Interior ducting can be done by volunteers. Materials: ducting, elbows, hangers. | ** Install AC in new lounge. | ||
** Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser. The roof perforation will be done by a professional roofer. Interior ducting can be done by volunteers. Makeup air? Materials: ducting, elbows, hangers. | |||
** Install ventilation duct and fan for the kitchen. Use the duct currently used by the laser. | ** Install ventilation duct and fan for the kitchen. Use the duct currently used by the laser. | ||
** Install ventilation duct and fan for small metals (jewelry). | ** Install ventilation duct and fan for small metals (jewelry). | ||
** [for plan 1,2] Move dust collection system for woodworking. Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. | ** [for plan 1,2] Move dust collection system for woodworking. Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system. | ||
** Extend ventilation duct and add hood for hot metals. | |||
* Electrical | * Electrical | ||
| Line 22: | Line 24: | ||
* Plumbing | * Plumbing | ||
** Install work sink on the wall adjacent to the kitchen, next to the sliding fire door. Materials: sink, misc. plumbing. | ** Install work sink on the wall adjacent to the kitchen, next to the sliding fire door. Materials: sink, misc. plumbing. | ||
** Install work sink at the top of the stairs next to upstairs bathroom. | |||
** Remove old sink in new lounge. | |||
*Install a partition between the Elston and alley sides of the new space. | *Install a partition between the Elston and alley sides of the new space. | ||
| Line 36: | Line 40: | ||
*Purchase and install shelving for member storage. | *Purchase and install shelving for member storage. | ||
*Benches for general work area. | |||
* Compressed air for new shop. | |||