Vote to Fund Space Expansion Buildout: Difference between revisions

From Pumping Station One
Dba (talk | contribs)
Dba (talk | contribs)
Line 21: Line 21:
** [for plan 1,2] Move dust collection system for woodworking.  Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system.
** [for plan 1,2] Move dust collection system for woodworking.  Materials: ducting, elbows, wyes, hangers blast gates. Purchase new filter for the Jet collector to aid with the transition to the new system.


*[all plans] Install new power outlets for cold metals and hot metals.  Materials: conduit, wire, outlets.
* Electrical
** [all plans] Install new power outlets for cold metals and hot metals.  Materials: conduit, wire, outlets.


*Remove temporary partition in new lounge. Paint and repair drywall if necessary.  Materials: paint.
* Plumbing
 
** Install work sink on the wall adjacent to the kitchen, next to the sliding fire door.  Materials: sink, misc. plumbing.
*Install work sink on the wall adjacent to the kitchen, next to the sliding fire door.  Materials: sink, misc. plumbing.


*Install a partition between the Elston and alley sides of the new space.
*Install a partition between the Elston and alley sides of the new space.


*Obtain necessary permits if they are deemed appropriate.
*Obtain necessary permits if they are deemed appropriate.
*Remove temporary partition in new lounge. Paint and repair drywall if necessary.  Materials: paint.


*Move equipment to new locations.
*Move equipment to new locations.
Line 38: Line 40:


*Purchase and install shelving for member storage.
*Purchase and install shelving for member storage.