Vote to Fund Space Expansion Buildout: Difference between revisions
From Pumping Station One
| Line 13: | Line 13: | ||
Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser. The roof perforation will be done by a professional roofer. Interior ducting can be done by volunteers. Materials: ducting, elbows, hangers. | Install a 4" ventilation duct and fan in the clean CNC room to be used by the laser. The roof perforation will be done by a professional roofer. Interior ducting can be done by volunteers. Materials: ducting, elbows, hangers. | ||
Move | [for plan 1,2] Move dust collection system for woodworking. Materials: ducting, elbows, wyes, hangers blast gates. | ||
Install new power outlets for cold metals and hot metals. Materials: conduit, wire, outlets. | [all plans] Install new power outlets for cold metals and hot metals. Materials: conduit, wire, outlets. | ||
Install ventilation duct and fan for the kitchen. Use the duct currently used by the laser. | Install ventilation duct and fan for the kitchen. Use the duct currently used by the laser. | ||
| Line 30: | Line 30: | ||
Move equipment to new locations. | Move equipment to new locations. | ||
[for plan 1,2] Clean dust from trusses, walls, etc. in old shop. {we may want to hire this out} | |||
Remove tool cage walls. | |||