Board Meeting Notes 2016-01-19: Difference between revisions

From Pumping Station One
Lyn (talk | contribs)
Lyn (talk | contribs)
Line 47: Line 47:
*** Went over surveys from area hosts and members
*** Went over surveys from area hosts and members
*** Reevaluate space in 6 to 12 months
*** Reevaluate space in 6 to 12 months
** Safety Committee
***nothing is being done


=== Mail ===
=== Mail ===