Category:Broken Authorization: Difference between revisions
From Pumping Station One
m Robot: Cosmetic changes |
No edit summary |
||
| Line 1: | Line 1: | ||
The current areas have broken | The current areas have broken authorization paths. | ||
Examples of broken paths are not regularly scheduled | Examples of broken paths are not regularly scheduled authorizations, or authorizations where there are frequent complaints about not being able to get authorized. | ||
== On The Bridgeport Mill == | == On The Bridgeport Mill == | ||
There are currently no regular | There are currently no regular authorizations happening the on Mill. | ||
This currently requires Tier 1 | This currently requires Tier 1 Authorization. | ||
== On Metal Shop Basic Tools (Tier 1) == | == On Metal Shop Basic Tools (Tier 1) == | ||
The following tools fall under Tier 1 | The following tools fall under Tier 1 Authorization: | ||
* [[Central Machinery Metal Bandsaw]] | * [[Central Machinery Metal Bandsaw]] | ||
| Line 20: | Line 20: | ||
[[Tier 1 Cold Metals Authorization|Who's Tier 1 Certified, who can certify me?]] | [[Tier 1 Cold Metals Authorization|Who's Tier 1 Certified, who can certify me?]] | ||
Tier 1 | Tier 1 Authorization does not have a regular schedule, and substantial amounts of time pass between schedules. | ||
== Hot Metals == | == Hot Metals == | ||
Currently requires Cold Metals Tier 1 | Currently requires Cold Metals Tier 1 Authorization, which is unavailable. | ||