Meeting Notes 2010-07-06: Difference between revisions

From Pumping Station One
No edit summary
No edit summary
Line 18: Line 18:
2. Assign ________ (a member volunteer) to be the project leader for the
2. Assign ________ (a member volunteer) to be the project leader for the
i-Fi filming project.
i-Fi filming project.
**YAY: XXXXXXXXXXX (10 proxy) XXXXXX (6 yay)  
**YAY: XXXXXXXXXXX (10 proxy) XXXXXX (6)  
**PRESENT: XXXX (4)
**PRESENT: XXXX (4)
** NAY: XX (2)
** NAY: XX (2)
Line 28: Line 28:
organization with similar purpose, as determined by the board of
organization with similar purpose, as determined by the board of
directors.
directors.
This is required to file for 501c3 status.
(This is required to file for 501c3 status.)
**YAY: XXXXXXXXXXXXXXX (15)
**YAY: XXXXXXXXXXXXXXX (15 proxy) XXXXXXXX (8)
**NAY: (0)
**NAY: (0)