Meeting Notes 2010-07-06: Difference between revisions
From Pumping Station One
Ssutherlin (talk | contribs) No edit summary |
Ssutherlin (talk | contribs) No edit summary |
||
| Line 18: | Line 18: | ||
2. Assign ________ (a member volunteer) to be the project leader for the | 2. Assign ________ (a member volunteer) to be the project leader for the | ||
i-Fi filming project. | i-Fi filming project. | ||
**YAY: XXXXXXXXXXX (10 proxy) XXXXXX (6 | **YAY: XXXXXXXXXXX (10 proxy) XXXXXX (6) | ||
**PRESENT: XXXX (4) | **PRESENT: XXXX (4) | ||
** NAY: XX (2) | ** NAY: XX (2) | ||
| Line 28: | Line 28: | ||
organization with similar purpose, as determined by the board of | organization with similar purpose, as determined by the board of | ||
directors. | directors. | ||
This is required to file for 501c3 status. | (This is required to file for 501c3 status.) | ||
**YAY: XXXXXXXXXXXXXXX (15) | **YAY: XXXXXXXXXXXXXXX (15 proxy) XXXXXXXX (8) | ||
**NAY: (0) | **NAY: (0) | ||