2015 Budget Vote/General Area Budget: Difference between revisions

From Pumping Station One
Wikibot (talk | contribs)
m Bot: Cosmetic changes
Sylphiae (talk | contribs)
Line 119: Line 119:
|New drywall to put over the currently bare cinder block walls.
|New drywall to put over the currently bare cinder block walls.
|$1,100.00
|$1,100.00
|----
|}
== Repair and Maintenance ==
{| class="wikitable"
!Repair Name
!Repair Description
!Annual Cost
!Monthly Cost
|----
|General Repairs
|Simple Repairs around the space that don't require a professional
|
| $ 60.00
|----
|Vacuum Pump Oil
|4x 1L bottles Edwards Ultragrade 19, needed in 4Q 2015
| $ 150.00
|
|----
|Vacuum Pump Oil Odor Filters
|5x Carbon Odor Filters, needed in 4Q 2015
| $ 150.00
|
|----
|----
|}
|}