| Line 12: | Line 12: | ||
** we should also get a compressed water extinguisher for putting out clothes | ** we should also get a compressed water extinguisher for putting out clothes | ||
* real first aid kit | * real first aid kit | ||
** Done - mounted by the door to the kitchen, along with a burn kit and bloodborne pathogen kit --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) | |||
** 12 inch square acrylic mirrror next to it | ** 12 inch square acrylic mirrror next to it | ||
* safety gear wall | * safety gear wall | ||
** | ** More or less in place as of this writing --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) | ||
* Emergency shower (rumoured to be in the works) | * Emergency shower (rumoured to be in the works) | ||
== Infrastructure == | == Infrastructure == | ||
* better lighting | * better lighting | ||
** | ** Shop lighting is much improved --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) | ||
** under cabinet lighting | ** under cabinet lighting | ||
** emergency light | ** emergency light | ||
** | *** Sevin is currently working on a plan --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) | ||
* ventilation | * ventilation | ||
** fumes for welding, etc. | ** fumes for welding, etc. | ||
| Line 30: | Line 30: | ||
*** a switch needs to turn on both the axial fan and the fan in the main garage | *** a switch needs to turn on both the axial fan and the fan in the main garage | ||
** dust collection from saws | ** dust collection from saws | ||
*** Dust collector is in place and being routed various places --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) | |||
* power | * power | ||
** we have 2 outlets with 220 V (in the middle of the shop, one on each side) | ** we have 2 outlets with 220 V (in the middle of the shop, one on each side) | ||
| Line 37: | Line 38: | ||
*** TIG (GTAW) Welder | *** TIG (GTAW) Welder | ||
*** end mill (that we're going to get, right?) | *** end mill (that we're going to get, right?) | ||
**** Bridgeport installed and powered --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) | |||
*** lathe (also that we're going to get) | *** lathe (also that we're going to get) | ||
**** clausing runs on 110v --[[User:Dbever|Dbever]] ([[User talk:Dbever|talk]]) 15:34, 30 September 2014 (CDT) | |||
** are outlets on multiple circuits? | ** are outlets on multiple circuits? | ||
** extension cord reels hanging from ceilings (at least one for each workbench) | ** extension cord reels hanging from ceilings (at least one for each workbench) | ||