Boiler room circuits. PP1-1 scares me |
||
| Line 8: | Line 8: | ||
Back of the shop by the loading dock. Can't miss it. | Back of the shop by the loading dock. Can't miss it. | ||
Lots of sketchy shit in this one. | |||
Single phase and 2 pole circuits wired to 3 phase breakers. One apparent circuit wired to 2 panels. | |||
Several high amp 3 phase breakers that are unmapped. | |||
{|Class="wikitable sortable" border="1" style="td { border: 1px solid #000000}" | |||
|- | |||
! Breaker # !! Used !! What Is It | |||
|- | |||
| 14&16&18 || unused || 3 phase, 20 amp, 3 black. Wiring trough, boiler room. Possible dust collection circuit thru existing disconnect. | |||
|- | |||
| 19&16&18 || used || 2-120v circuits on a 3 phase breaker. Blue wires. Boiler & zone pumps, this is bad and wrong. | |||
|- | |||
| 22 || unused || this is a stray 208v single red wire on a 3 phase breaker that runs to a 3 phase disconnect in the boiler room. Should be disconnected and abandoned.(used to be paired with wires pp1-2 # 35&37) | |||
|- | |||
|} | |||
'''PP1-2''' | '''PP1-2''' | ||
| Line 27: | Line 47: | ||
|26 || yes, works || Currently connected to the entire east wall. This includes dust collector and Clausing electronics. Please do not connect chop saw table to east wall while others are working. | |26 || yes, works || Currently connected to the entire east wall. This includes dust collector and Clausing electronics. Please do not connect chop saw table to east wall while others are working. | ||
|- | |- | ||
| 35&37 || used || 40 amp 1 phase 240v thru a 3 phase disconect used as junction box to another 3 phase disconnect used as a 1 phase 35 amp disconnect. Compressor. | |||
|} | |} | ||