Tool Cage Proposal: Difference between revisions
From Pumping Station One
| Line 12: | Line 12: | ||
The current tool cage that Pumping Station:One inherited from the previous occupant is inadequate and has several code and safety violations; for example, | The current tool cage that Pumping Station:One inherited from the previous occupant is inadequate and has several code and safety violations; for example, | ||
The two electrical panels do not have thirty-six inches of clearance mandated by electrical code. | The two electrical panels do not have thirty-six inches of clearance mandated by electrical code. | ||
There is flammable material on and around the panels; this is not a good situation in a workshop that has a history of electrical fires. | There is flammable material on and around the panels; this is not a good situation in a workshop that has a history of electrical fires. | ||
It is unsafe for two people to occupy the cage at the same time. | It is unsafe for two people to occupy the cage at the same time. | ||
For these and other reasons the cage should be emptied, dismantled and replaced with a larger cage that is designed to integrate into the space as soon as is practice. | |||
== Location and Materials == | == Location and Materials == | ||