Tool Cage Proposal: Difference between revisions
From Pumping Station One
| Line 16: | Line 16: | ||
The two electrical panels do not have thirty-six inches of clearance mandated by electrical code. | The two electrical panels do not have thirty-six inches of clearance mandated by electrical code. | ||
There is flammable material on and around the panels; this is not a good situation in a workshop that has a history of electrical fires. | There is flammable material on and around the panels; this is not a good situation in a workshop that has a history of electrical fires. | ||