Keg 1: Difference between revisions
From Pumping Station One
m Robot: Automated text replacement (-doesitwork = WORKING +doesitwork = yes) |
m Robot: Cosmetic changes |
||
| Line 1: | Line 1: | ||
{{Template:EquipmentPage | {{Template:EquipmentPage | ||
|owner = Ryan Pierce | |owner = Ryan Pierce | ||
| Line 16: | Line 12: | ||
}} | }} | ||
==Problems/Caveats== | == Problems/Caveats == | ||
* gas inlet doesn't like to close. It'll be hard to leave this keg pressurized. | * gas inlet doesn't like to close. It'll be hard to leave this keg pressurized. | ||
| Line 22: | Line 18: | ||
* the pickup outlet tube has been sawn off (great if you have a big yeast cake) but doesn't draw all the beer if there's no yeast cake. surprise beer at cleanup time! | * the pickup outlet tube has been sawn off (great if you have a big yeast cake) but doesn't draw all the beer if there's no yeast cake. surprise beer at cleanup time! | ||
==History== | == History == | ||
| Line 76: | Line 72: | ||
|[[Beer 2013.08]] | |[[Beer 2013.08]] | ||
|} | |} | ||
[[Category:Kegs]] | |||
[[Category:Brewing]] | |||
[[Category:Photographs Needed]] | |||
Revision as of 18:12, 17 March 2014
| Owner/Loaner | Ryan Pierce |
|---|---|
| Serial Number | Unknown |
| Make/Model | Cornelius Keg, Missing Foot |
| Arrival Date | September, 2012 |
| Usability | yes |
| Contact | Ryan Pierce |
| Where | Beer Church |
| Authorization Needed | yes |
| Hackable | NO |
| Estimated Value | $80 |
| Host Area | {{{hostarea}}} |
Problems/Caveats
- gas inlet doesn't like to close. It'll be hard to leave this keg pressurized.
- no foot, has to sit in a foam stand
- the pickup outlet tube has been sawn off (great if you have a big yeast cake) but doesn't draw all the beer if there's no yeast cake. surprise beer at cleanup time!
History
| Date | Person(s) | Action | Contents |
|---|---|---|---|
| 2/10/2013 | Eric Stein & Esther | Clean & Sterilize - PBW soak, iodine soak, removal and soaking of fittings | N/A |
| 2/10/2013 | Eric Stein & Esther | Kegged w/priming sugar, placed in fermenting chamber | Beer 2013.01 |
| 2/16/2013 | Eric Stein | Moved to serving fridge | Beer 2013.01 |
| 3/3/2013 | Eric Stein | Put on Tap 1. | Beer 2013.01 |
| 3/6/2013 | Eric Stein | Bottled the last of it. Off tap. | smelly air |
| 3/25/2013 | Eric Stein | Started clean, Pbw water | pbw water |
| ~3/31/2013 | Tucker Tomlinson | put sake in it? | sake |
| 7/24/2013 | Tucker Tomlinson | bottled all of it, cleaned up | soaking pbw |
| 9/24/2013 | Brittany Zimmerman | sanitized, put Beer 2013.08 in it | Beer 2013.08 |