Knitting Machines: Difference between revisions

From Pumping Station One
Jesseseay (talk | contribs)
Jesseseay (talk | contribs)
Line 240: Line 240:


#Knit 4 rows. Transfer stitch at needles 1L, 11L, 10R. Leave empty needles in B position.
#Knit 4 rows. Transfer stitch at needles 1L, 11L, 10R. Leave empty needles in B position.
#Knit 10 rows. Drop stitches at 1L, 11L, 10R. Latch up all 3 as ribs. Hang top stitch back on needle. Knit 2 rows.
#Knit 10 rows. Drop stitches at 1L, 11L, 10R. Latch up all 3 as ribs. Hang top stitch back on needle. Knit 2 rows.
#Transfer same stitches again. Leave 1L in work. Move needles 11L and 10R to A position. Knit 6 rows.
#Transfer same stitches again. Leave 1L in work. Move needles 11L and 10R to A position. Knit 6 rows.
#Drop stitch on 1L. Leave 1L in work.
#Drop stitch on 1L. Leave 1L in work.
#Knit 2 more rows. Run tapestry needle with yarn through all stitches and remove work from machine.
#Knit 2 more rows. Run tapestry needle with yarn through all stitches and remove work from machine.
#Use latch tool to crochet up ladders with contrast color.
#Use latch tool to crochet up ladders with contrast color.