Area Host Meeting Notes 11-27-2012: Difference between revisions
From Pumping Station One
no meeting on 12/4 |
m Robot: Cosmetic changes |
||
| Line 36: | Line 36: | ||
* tool certification should be moved to the backburner | * tool certification should be moved to the backburner | ||
* Welding area is coming along decently, equipment and infrastructure is being completed | * Welding area is coming along decently, equipment and infrastructure is being completed | ||
** Power is blocking completion. | ** Power is blocking completion. Need to run 220 and 120. | ||
* Shellie needs blog and calendar access | * Shellie needs blog and calendar access | ||
* hot metal should be split from machining. | * hot metal should be split from machining. Later. | ||