Area Host Meeting Notes 11-06-2012: Difference between revisions

From Pumping Station One
Tsaylor (talk | contribs)
No edit summary
Tsaylor (talk | contribs)
No edit summary
Line 7: Line 7:
In attendance:
In attendance:


* Anna Yu
* Adrianna McKinley
* Colin Parsons
* Tim Saylor
* Rhys
* Steve
* Shawn


Agenda:
Agenda:
Line 15: Line 22:


Minutes:
Minutes:
* The wood shop and metal shop should be two separate areas
* The certification program is broken.
** too many people are using things without certification
** Nobody enforces required certification
** How do I get certified is the next question.  We have to have an answer.  Once a month classes?
** There's a lot of latent demand for certification, especially in the metal shop.
** The current problem is awareness of the options available for learning things.
** Signs used to work in the old shop, maybe we need more signs.  With people's pictures on them.
** Set up machines with rfid readers to prevent uncertified users
** grace period after certification where a trainer checks their setup before they start working?
** Need a simplified manual for the tools that users can learn from on their own.
** Give them a physical copy of the manuals.
* We should get a vending machine for tooling / electronic parts
* Area hosts should provide a list of essential infrastructure by our next meeting
* Should we use the wiki or something easier?  (google docs?)
* Next meeting in three weeks.  (All area hosts' TODO)
* create a google group and public email forward to the area hosts. (Tim's TODO)