Board Meeting Notes 2012-09-18: Difference between revisions
From Pumping Station One
| Line 29: | Line 29: | ||
* Dan | * Dan | ||
** Install shop air valve between our area and Tony's and attach our compressor to the system. | ** Install shop air valve between our area and Tony's and attach our compressor to the system. | ||
* Steve | |||
** We need some replacement part for the laser cutter. (a belt and the auto-focus spring) | |||
* Shawn | * Shawn | ||
| Line 34: | Line 37: | ||
* Unassigned | * Unassigned | ||
** Change address update. | ** Change address update. | ||
** We need to verify the code status of the fire door in the metal shop | ** We need to verify the code status of the fire door in the metal shop | ||
** We need to improve our implementation of the tool certification process. | ** We need to improve our implementation of the tool certification process. | ||