Board Meeting Notes 2012-08-21: Difference between revisions

From Pumping Station One
No edit summary
No edit summary
Line 69: Line 69:
** Full Members: 68
** Full Members: 68
** Friends of PS1: 2
** Friends of PS1: 2
*
* Garbage
** We are considering increasing our dumpster size to 4 cubic meters.
** We need to find a place for it/talk to Tony about it
* We need to discuss the kiln and light exposure table and let Tony know.
* Steve suggested that we need to keep the tables in the workshop clean whenever they are not being actively used.
** Steve has created a place in the back for donations.
** "Limbo" needs to be emptied.
** Space equipment is mixed in with the personal stuff in "Limbo"
   
   
Meeting End:  XX:XX pm
Meeting End:  07:50 pm