Board Meeting Notes 2011-09-27: Difference between revisions
From Pumping Station One
Onthelevel (talk | contribs) |
Onthelevel (talk | contribs) |
||
| Line 9: | Line 9: | ||
* Move the boxes down a few inches after the meeting. | * Move the boxes down a few inches after the meeting. | ||
* Element 14 video status: skipping September? Medical for October. Bio sensor anyone? | * Element 14 video status: skipping September? Medical for October. Bio sensor anyone? | ||
* Internal pen test? | |||
* Power upgrade progress. Power not yet connected. | * Power upgrade progress. Power not yet connected. | ||
* Term limits vote. 4 choices as stands. | * Term limits vote. 4 choices as stands. | ||