* Feburary 2023: Failed Switchmode PSU in the shim control box was replaced with a center-tap transformer and a self-designed +/-15V 7815/7915 linear PSU on an aluminum substrate PCB.
* Feburary 2023: Failed Switchmode PSU in the shim control box was replaced with a center-tap transformer and a self-designed +/-15V 7815/7915 linear PSU on an aluminum substrate PCB.
* As of March 2023, it still works.
* As of March 2023, it still works.
* October 2023: Primary Hard Drive (32GB SSD failed.) Recovered onto some random hard drive with <code>dddrescue</code>. Pending analysis of corrupted files via <code>ddru_ntfsfindbad</code>