General Operations Team: Difference between revisions
From Pumping Station One
Garynhouse (talk | contribs) |
Garynhouse (talk | contribs) |
||
| Line 92: | Line 92: | ||
These are being reformed into the action items system above. | These are being reformed into the action items system above. | ||
1. Fix water dispenser in Arts. Hot water leak | 1. Fix water dispenser in Arts. Hot water leak (done Aug 2022) | ||
2. Wire lights in spray booth (purchased fixture on booth top) | 2. Wire lights in spray booth (purchased fixture on booth top temporary wiring done but must be brought up to code) | ||
3. DONE GN Fix replace front stair lights. | 3. DONE GN Fix replace front stair lights. | ||
| Line 104: | Line 104: | ||
6. Document electrical. Document panel door legends to wiki(DONE GN). Update CAD with current wiring (mostly done AM). Plot locations of projected wiring for HM/CC/General move (needs mostly done SB and Hosts, CAD in process AM, bid spec AM & BD tbd). | 6. Document electrical. Document panel door legends to wiki(DONE GN). Update CAD with current wiring (mostly done AM). Plot locations of projected wiring for HM/CC/General move (needs mostly done SB and Hosts, CAD in process AM, bid spec AM & BD tbd). | ||
7. Transition member paid storage to share with MMT ( | 7. Transition member paid storage to share with MMT (done GN & Scott Yoder ) | ||
8. Replace air compressor and add air dryer (DONE. DE, AM GN BD and others. ) | 8. Replace air compressor and add air dryer (DONE. DE, AM GN BD and others. ) | ||
9. Plan and execute air needs plumbing for HM/CM/General move | 9. Plan and execute air needs plumbing for HM/CM/General move (planning completed April 2022) | ||
== Powers & Limitations == | == Powers & Limitations == | ||