General Operations Team: Difference between revisions
From Pumping Station One
Garynhouse (talk | contribs) |
Garynhouse (talk | contribs) |
||
| Line 78: | Line 78: | ||
Coordinate with the Area Hosts to complete tasks in each area as needed | Coordinate with the Area Hosts to complete tasks in each area as needed | ||
Short term tasks. | == Short term tasks. == | ||
1. Fix water dispenser in Arts. Hot water leak | 1. Fix water dispenser in Arts. Hot water leak | ||
2. Wire lights in spray booth (purchased fixture on booth top) | 2. Wire lights in spray booth (purchased fixture on booth top) | ||
3. DONE GN Fix replace front stair lights. | 3. DONE GN Fix replace front stair lights. | ||
4. Fire doors. In booth fix rails for rolling door (bolt anchors loose). Rolling between booth and woods (replace bolts attaching rail to wall (straighten and make plumb) | 4. Fire doors. In booth fix rails for rolling door (bolt anchors loose). Rolling between booth and woods (replace bolts attaching rail to wall (straighten and make plumb) | ||
5. Relocated booth air drop to left side of booth. | 5. Relocated booth air drop to left side of booth. | ||
6. Document electrical. Document panel door legends to wiki(DONE GN). Update CAD with current wiring (mostly done AM). Plot locations of projected wiring for HM/CC/General move (needs mostly done SB and Hosts, CAD in process AM, bid spec AM & BD tbd). | 6. Document electrical. Document panel door legends to wiki(DONE GN). Update CAD with current wiring (mostly done AM). Plot locations of projected wiring for HM/CC/General move (needs mostly done SB and Hosts, CAD in process AM, bid spec AM & BD tbd). | ||
7. Transition member paid storage to share with MMT (almost done GN & Scott Yoder ) | 7. Transition member paid storage to share with MMT (almost done GN & Scott Yoder ) | ||
8. Replace air compressor and add air dryer (DONE. DE, AM GN BD and others. ) | 8. Replace air compressor and add air dryer (DONE. DE, AM GN BD and others. ) | ||
9. Plan and execute air needs plumbing for HM/CM/General move | 9. Plan and execute air needs plumbing for HM/CM/General move | ||