Board Meeting Notes 2021-01-19: Difference between revisions
From Pumping Station One
| Line 57: | Line 57: | ||
GENERAL OPERATIONS: | GENERAL OPERATIONS: | ||
- No update yet on the roof. Andrew Morris has yet to receive a call back from the roofer. | - No update yet on the roof. Andrew Morris has yet to receive a call back from the roofer. | ||
- Andrew Morris noticed the Wood Shop boiler was not venting properly. He attempted to fix the problem with the draft, but is still not 100% sure if it is venting into the building. | - Andrew Morris noticed the Wood Shop boiler was not venting properly. He attempted to fix the problem with the draft, but is still not 100% sure if it is venting into the building. | ||