=== 5. Officer & Team Lead Updates ===
=== 5. Officer & Team Lead Updates ===


GENERAL OPERATIONS:
- No update yet on the roof. Andrew Morris has yet to receive a call back from the roofer.
- Andrew Morris noticed the Wood Shop boiler was not venting properly. He attempted to fix the problem with the draft, but is still not 100% sure if it is venting into the building.
- Electronics lights are in rough shape. There are approximately only three fixtures working in the electronics area. It is probably time to convert them to LEDs as was (mostly) done in General.
- Lockout-tagout stations are hung and stocked. We’ll need to come up with communication about using those.
- Andrew Morris is in the process of drafting a hazardous materials policy for future comment and discussion. No timeline on set on the completion of this policy.


TECH TEAM:


MEMBER MANAGEMENT TEAM:
TREASURY TEAM:
PR TEAM:
EDUCATION TEAM: