Drinking Station: One: Difference between revisions

From Pumping Station One
No edit summary
Line 100: Line 100:
|Joe Mertz
|Joe Mertz
|Cleaned both lines and keg adapters. Began install of RFID Lockout System.
|Cleaned both lines and keg adapters. Began install of RFID Lockout System.
|-
|2019-04-01
|Joe Mertz
|Cleaned beer line and swapped keg.
|-
|2019-04-16
|Joe Mertz
|Cleaned beer line and swapped keg.
|}
|}