Belovac Vacuum Forming Machine: Difference between revisions

From Pumping Station One
Mariano (talk | contribs)
No edit summary
Mariano (talk | contribs)
No edit summary
Line 83: Line 83:
|-
|-
|
|
# Secure Buck/Form/Mould to Vacuum table
# Secure Buck/Form/Mould to Vacuum table.
Note: it is recommended to have the mold be a bit taller than desired part, to allow space for cut separation.
# Check seals around material and mold
# Check seals around material and mold
|-
|-
Line 142: Line 143:
|-
|-
|
|
# Open Vacuum Valve
# Open Vacuum Valve. You should see the plastic part quickly take the shape of the mold.
# Monitor pull of material over mold
# Monitor pull of material over mold
|
|
Line 149: Line 150:
|-
|-
|  
|  
# Close Vacuum Valve to Turn off Vacuum
# Close Vacuum Valve to Turn off Vacuum, when part is ready.
# Allow part part to sufficient time cool. This is dependent on the thickness of your material.
# Allow part sufficient time to cool, before separation. This time frame is dependent on the thickness of your material.
# Push bed/platen/platform lever Up to lower down and pull away from part.
# Push bed/platen/platform lever Up to lower down and pull mold away from formed part.
|
|
[[File:Bvf_vacuum_valve.jpg|300px]]
[[File:Bvf_vacuum_valve.jpg|300px]]
Line 164: Line 165:
# Turn off Main Wall power.
# Turn off Main Wall power.
|
|
[[File:Bvf machine power.jpg|300px]]
[[File:Bvf main power.jpg|300px]]
[[File:Bvf main power.jpg|300px]]
[[File:Bvf machine power.jpg|300px]]
|-
|-
|  
|