Belovac Vacuum Forming Machine: Difference between revisions

From Pumping Station One
Mariano (talk | contribs)
No edit summary
Mariano (talk | contribs)
No edit summary
Line 92: Line 92:
|
|
# Move material frame into heater
# Move material frame into heater
|[[File:Bvf_vacuum_valve.jpg|300px]]
|-
|
# Close Vacuum Valve
# Close Vacuum Valve
# Turn on pump, to begin to build vacuum  
# Turn on pump, to begin to build vacuum  
|[[File:Bvf_vacuum_valve.jpg|300px]]
|[[File:Bvf control panel.jpeg|300px]]
|[[File:Bvf control panel.jpeg|300px]]
|-
|-
Line 115: Line 119:
# Open Vacuum Valve
# Open Vacuum Valve
# Monitor pull of material over mold
# Monitor pull of material over mold
|[[File:Bvf_vacuum_valve.jpg|300px]]
|[[File:Bvf_vacuum_pull.jpg|300px]]
|-
|-
|  
|