Belovac Vacuum Forming Machine: Difference between revisions

From Pumping Station One
Mariano (talk | contribs)
No edit summary
Mariano (talk | contribs)
No edit summary
Line 101: Line 101:
# Pull Material frame forward (towards front/away from heaters)
# Pull Material frame forward (towards front/away from heaters)
# Inspect Plastic is ready (sufficiently heated/soft)
# Inspect Plastic is ready (sufficiently heated/soft)
# push lever to raise vacuum bed/platen
|-
|
# push lever down to raise vacuum bed/platen/platform
|
[[File:Bvf_platform_lever.jpg|300px]]
|-
|
# Open Vacuum Valve
# Open Vacuum Valve
# Monitor pull of material over mold
# Monitor pull of material over mold
|-
|-
|  
|  
# Turn off Vacuum
# Close Vacuum Valve to Turn off Vacuum
# Allow part part to sufficient time cool. This is dependent on the thickness of your material.
# Allow part part to sufficient time cool. This is dependent on the thickness of your material.
# Push bed/platen/platform lever Up to lower down and pull away from part.
|-
|-
|  
|