Belovac Vacuum Forming Machine: Difference between revisions

From Pumping Station One
Mariano (talk | contribs)
No edit summary
Mariano (talk | contribs)
No edit summary
Line 63: Line 63:
# Insert sheet of material into Frame
# Insert sheet of material into Frame
# Close the frame latch to the secure the material
# Close the frame latch to the secure the material
# Secure Mold to Vacuum table
# Secure Buck/Form/Mould to Vacuum table
# Check seals around material and mold
# Check seals around material and mold
|-
|-
Line 98: Line 98:
|
|
# Pull Material frame forward
# Pull Material frame forward
# Inspect Plastic is ready
# Inspect Plastic is ready (sufficiently heated/soft)
# push level to raise vacuum bed
# push lever to raise vacuum bed
# Open Vacuum Valve
# Open Vacuum Valve
# Monitor pull of material over mold
# Monitor pull of material over mold
Line 105: Line 105:
|  
|  
# Turn off Vacuum
# Turn off Vacuum
# Turn off Heater
# Allow part part to sufficient time cool. This is dependent on the thickness of your material.
|-
|
'''Shutdown Procedure'''
# Turn off Heater.
# Disconnect pneumatic hose. Return to CNC Plasma Cutter.
# Disconnect pneumatic hose. Return to CNC Plasma Cutter.
# Turn off machine power.
# Turn off Main Wall power.
|-
|
'''Cleanup Procedure'''
# Cleanup any unused material or scrap.
# Throw away failed part pulls in dumpster. Do not leave in Hot Metals area.